HEAVY INFRASTRUCTURE OPERATIONAL OS / NEC3 · NEC4

Precision Project Controls for Heavy Infrastructure.

Precision Project Controls for Heavy Infrastructure.

Precision Project Controls for Heavy Infrastructure.

Replace disjointed site logs with an agile, audit-tight 12-week Lookahead and continuous Digital Evidence Diary. Establish one unshakeable baseline to protect contractor margins and satisfy NEC contract frameworks.

BUILT FOR SITE TEAMS. DEFENSIBLE AT FINAL ACCOUNT.

PRECISION / PROJECT WORKSPACE

PILOT BUILD / 2027

A-ROAD IMPROVEMENT / CH.030–220 / SAMPLE DATA

12-Week Operational Lookahead

Baseline Rev. 04 • 6-day calendar • Week 08

Programme

Daily diary

Commercial tracker

All disciplines

Calendar: 6-day

Data date: 22 Feb 2027

WBS / ACTIVITY

FEBRUARY 2027

MARCH

WORK PACKAGE

WORK PACKAGE

W01

W02

W03

W04

W05

W06

W07

W8

W9

W10

W11

W12

03 EARTHWORKS

03 EARTHWORKS

Bulk excavation

Bulk excavation

Formation preparation

Formation preparation

03.2 DRAINAGE

03.2 DRAINAGE

Carrier drain run 01

Carrier drain run 01

Manholes MH12–18

Manholes MH12–18

03.3 STRUCTURES

03.3 STRUCTURES

Abutment base pour

Abutment base pour

Shift Diary & Delay Evidence

MON 22 FEB 2027 / DAY SHIFT

Carrier drain run 01

CHAINAGE

CH 1+240 – 1+385

SHIFT OUTPUT

145 m / 180 m planned

DELAY CLASSIFICATION

Client-instructed works · CI

DELAY EVENT / 0024

Uncharted service. Works held pending client instruction. 3.5 gang-hours recorded.

APPLY 62% TO PROGRAMME

Earthworks

Drainage

Progress

Delay / hold

8 WORK PACKAGES / BASELINE PROTECTED

EVIDENCE LINKED

PROGRAMME + EVIDENCE / ILLUSTRATIVE SAMPLE DATA

12-WEEK HORIZON

Site-level planning

4 MEASUREMENT MODES

Commercial clarity

NEC3 / NEC4

Contemporaneous evidence

POWER BI READY

Structured reporting

01 / THE DELIVERY GAP

The reality of major civils.

01 / RISK

Disconnected Scheduling

Primavera P6 fails daily lookahead reality and gang-level site constraints.

02 / RISK

Lost Site Records

Unsubstantiated dayworks, plant downtime, and weather impacts trapped in paper logs.

03 / RISK

Commercial Verification

Disputed chainages and unmeasured quantities driving valuation battles at final account.

04 / RISK

Claim Margin Leakage

Disputed or time-barred Compensation Events (CE) under strict NEC contract rules.

02 / THE OPERATIONAL CONTROL LAYER

One baseline. Every discipline connected.

From the morning briefing to the final account, keep programme, physical progress and evidence in step.

PLANNING / PROGRAMME

5 / 6 / 7

DAY WORKING CALENDARS

Dynamic 12-Week Operational Gantt

5, 6, and 7-day working calendars, duration-weighted WBS rollups, forward-pass logic, and automatic delay rippling without corrupting master baselines.

MODULE 01 / CONNECTED BY DESIGN

QUANTITIES / VALUATION

m · m² · m³

PHYSICAL PROGRESS, VERIFIED

4-Way Commercial Measurement

Built for physical infrastructure. Track by Linear Chainage (Road Box m, m², m³), Measured BoQ units, sequential checklist steps, or manual progress.

MODULE 02 / CONNECTED BY DESIGN

RECORDS / CONTRACT

CI / CE

EVIDENCE AT THE POINT OF WORK

Contemporaneous NEC Diary & CE Defense

Daily shift logs, subcontractor allocation, client-instructed works (CI) tagging, and a direct ‘Apply % to Programme’ verification bridge.

MODULE 03 / CONNECTED BY DESIGN

Power BI Export

Take structured programme, progress and diary records into your project reporting environment.

THE PLATFORM / FROM PLAN TO PROOF

Built around the way site teams work.

01 / 12-WEEK OPERATIONAL LOOKAHEAD

See the next 12 weeks at a glance

See the next 12 weeks at a glance

A rolling programme with one week of look-back and twelve weeks ahead. Summary rows roll up automatically, linked activities follow their predecessors, and holds, delays and client-instructed works are flagged where your team can’t miss them. Issue it each week and keep every past version on record.

PROJECT CONTROLS · LIGHT IVORY

A-Road Improvement Ch. 030–220

OUR COMPANY

Site Delivery Ltd

MAIN CONTRACTOR

Main Contractor Ltd

Lookahead Programme

Daily Diary

Commercial

12-Week Operational Lookahead

Wk 1 · W/C 19/10/26 · 1 week look-back + 12 weeks look-ahead

This week

Issue register

Add Activity

WBS / ACTIVITY

START

DUR

OCT 2026 / NOV / DEC

1 Road Construction

12 Oct

57d

1.1 Site Clearance

13 Oct

15d

1.1.1 Vegetation Clearance

14 Oct

5d

1.1.2 Strip Topsoil · DLY

15 Oct

6d

1.1.3 Demolition & Breakout

16 Oct

8d

1.2 Drainage

17 Oct

28d

1.2.1 Carrier Drain Ch.030–120

18 Oct

10d

1.2.2 Gullies & Connections

19 Oct

5d

1.2.3 Carrier Drain Ch.120–220

20 Oct

10d

1.3 Earthworks

12 Oct

16d

1.3.1 Cut to Fill Ch.030–220

13 Oct

12d

1.3.2 Capping Layer

14 Oct

8d

1.4 Culvert CV01 · HOLD

15 Oct

22d

1.5 Kerbing & Surfacing

16 Oct

29d

1.5.2 Sub-base Type 1

17 Oct

6d

Drainage / Earthworks / Progress / Actual / Today / HOLD / Client-instructed

Sample data. Fictional project and contractor names; quantities and evidence are illustrative.

02 / DAILY DIARY

A site diary your foremen will actually fill in

A site diary your foremen will actually fill in

Pick the activity and record the day’s quantities, labour, plant and weather, then add photos. If the activity has fallen behind programme, the diary asks for a reason, and the PM, Agent and QS are alerted straight away. Every submitted entry is stamped, keeps its history, and prints as a PDF for the client or subcontractor.

PROJECT CONTROLS · LIGHT IVORY

A-Road Improvement Ch. 030–220

OUR COMPANY

Site Delivery Ltd

MAIN CONTRACTOR

Main Contractor Ltd

Lookahead Programme

Daily Diary

Commercial

Daily Diary

Linked to the lookahead programme · one entry per activity per day

DIARY DATE

23 Oct 2026

YOUR INITIALS

JD

Road Construction / Drainage

1.2.1 Carrier Drain Ch.030–120

Drainage Subcontractor Ltd · Drainage Gang 1

PROGRESS / WORK DONE TODAY

Excavated and laid 300mm carrier pipe Ch.060–078 on granular bedding. First 12 m backfilled and compacted.

LABOUR

1 ganger, 3 pipelayers, 1 banksman; setting-out engineer (half day).

PLANT

21t excavator, 9t dumper, trench box, plate compactor and laser level.

EXCAVATE TRENCH

22 m

LAY & BED PIPE · PRIMARY

18 m

BACKFILL & COMPACT

12 m

Schedule Warning

Expected progress 30% · Actual progress 20%. Explain the slip before submitting.

WEATHER / DELAY CAUSE

Heavy rain · 2.5 hours lost

WHAT WAS THE DELAY?

Trench flooded during heavy rain. Pumped out before pipelaying resumed. PM, Agent and QS notified.

EVIDENCE / 2 SAMPLE ATTACHMENTS

Trench record 01.jpg · Carrier pipe bedding 02.jpg

Submit diary

Sample data. Fictional project and contractor names; quantities and evidence are illustrative.

03 / COMMERCIAL TRACKER

Track progress the way you measure it

Track progress the way you measure it

Choose how each activity is measured: manual %, a checklist, measured units, or chainage for road build-ups. Quantities from the diary feed straight into project quantities and a Power BI export, so progress lines up with the BoQ.

PROJECT CONTROLS · LIGHT IVORY

A-Road Improvement Ch. 030–220

OUR COMPANY

Site Delivery Ltd

MAIN CONTRACTOR

Main Contractor Ltd

Lookahead Programme

Daily Diary

Commercial

12-Week Operational Lookahead

Wk 1 · W/C 19/10/26 · 1 week look-back + 12 weeks look-ahead

This week

Issue register

Add Activity

WBS / ACTIVITY

START

DUR

OCT 2026 / NOV / DEC

1 Road Construction

12 Oct

57d

1.1 Site Clearance

13 Oct

15d

1.1.1 Vegetation Clearance

14 Oct

5d

1.1.2 Strip Topsoil · DLY

15 Oct

6d

1.1.3 Demolition & Breakout

16 Oct

8d

1.2 Drainage

17 Oct

28d

1.2.1 Carrier Drain Ch.030–120

18 Oct

10d

1.2.2 Gullies & Connections

19 Oct

5d

1.2.3 Carrier Drain Ch.120–220

20 Oct

10d

1.3 Earthworks

12 Oct

16d

Drainage / Earthworks / Progress / Actual / Today / HOLD / Client-instructed

Edit Activity 1.5.2

ACTIVITY

1.5.2 Sub-base Type 1

DURATION / CALENDAR

6 working days / 5-day (Mon–Fri)

Tracking setup

How the foreman records progress for this activity in the daily diary.

Manual %

Checklist

Measured (Units)

Chainage (Road Box)

BoQ tags — earthworks

EARTHWORKS OPERATION

Place Material / Fill

MATERIAL CLASSIFICATION

Type 1 Sub-base (SHW Clause 803)

START CH (M)

30

FINISH CH (M)

220

WIDTH (M)

7.3

THICKNESS (M)

0.15

PRIMARY OPERATION

Lay & compact Type 1

Progress = primary operation’s length to date ÷ planned length. Other operations are recorded without changing progress.

Planned: 190 m · 1,387 m² · 208.05 m³

DELAYS & STOPPAGES

Record design changes, clashes or an outstanding RFI.

Save

Sample data. Fictional project and contractor names; quantities and evidence are illustrative.

04 / PLAN AN ACTIVITY

Add an activity in seconds

Add an activity in seconds

One side panel covers discipline, gang, delivering company, links to other activities, working calendar and how progress is tracked. Dates are calculated from the logic, and the programme stays in view while you work.

PROJECT CONTROLS · LIGHT IVORY

A-Road Improvement Ch. 030–220

OUR COMPANY

Site Delivery Ltd

MAIN CONTRACTOR

Main Contractor Ltd

Lookahead Programme

Daily Diary

Commercial

12-Week Operational Lookahead

Wk 1 · W/C 19/10/26 · 1 week look-back + 12 weeks look-ahead

This week

Issue register

Add Activity

WBS / ACTIVITY

START

DUR

OCT 2026 / NOV / DEC

1 Road Construction

12 Oct

57d

1.1 Site Clearance

13 Oct

15d

1.1.1 Vegetation Clearance

14 Oct

5d

1.1.2 Strip Topsoil · DLY

15 Oct

6d

1.1.3 Demolition & Breakout

16 Oct

8d

1.2 Drainage

17 Oct

28d

1.2.1 Carrier Drain Ch.030–120

18 Oct

10d

1.2.2 Gullies & Connections

19 Oct

5d

1.2.3 Carrier Drain Ch.120–220

20 Oct

10d

1.3 Earthworks

12 Oct

16d

Drainage / Earthworks / Progress / Actual / Today / HOLD / Client-instructed

Add Activity

TASK NAME

Filter Drain Ch.120–220 (150mm)

CLIENT-INSTRUCTED WORKS

No · original scope

DISCIPLINE

Drainage

GANG

Drainage Gang 2

DELIVERED BY

Drainage Subcontractor Ltd

PARENT

1.2 Drainage

PREDECESSOR

1.2.1 Carrier Drain Ch.030–120

DEPENDENCY TYPE / LAG

SS — Start-to-Start / +3 days

DURATION / CALENDAR

8 working days / 5-day (Mon–Fri)

DATES CALCULATED FROM LOGIC

Mon 26 Oct 2026 – Wed 04 Nov 2026

Tracking setup

How the foreman records progress for this activity in the daily diary.

Manual %

Checklist

Measured (Units)

Chainage (Road Box)

BOQ TAGS — PIPE RUNS

Catchment 1 / 150mm / Filter

TARGET QUANTITY

100 m

OPERATIONS

Excavate trench · Lay pipe & geotextile (primary) · Place filter media

Add Activity

Sample data. Fictional project and contractor names; quantities and evidence are illustrative.

03 / INSIDE THE PLATFORM

Built around how site teams actually work.

03 / 2027 CONTRACTOR PILOT

Secure Early Access for Your Project Team

Secure Early Access for Your Project Team

Secure Early Access for Your Project Team

Now accepting Tier 1 and Tier 2 contractor partners for live 2027 infrastructure pilot deployments.

ENGINEERED FOR UK INFRASTRUCTURE

Highways / Rail / Energy / Water

Your details will only be used to discuss the contractor pilot.

© 2026 Precision Project Controls Ltd. Engineered for UK Civil Infrastructure Delivery.